SWARTZ CREEK, MI – Culvert work and drainage enhancements will shut the eastbound I-69 entrance ramp in Swartz Creek this week.

The Michigan Division of Transportation introduced the $80,000 in work is scheduled to shut the Miller Highway ramp to eastbound I-69 starting Monday, July 30 and working by means of Saturday, Aug. 4.

READ  ‘Intoxicating freedom, gripping worry’: Mumia Abu-Jamal on life as a Black Panther | US information

Single lane closures are additionally set to happen alongside eastbound I-69 from Morrish Highway to Miller Highway, in accordance with the state Division of Transportation. Shoulder closures may even happen throughout the work interval.

READ  Even Amongst Entrepreneurs, There’s a Gender Pay Hole

The work is supposed to enhance drainage close to the highway, forestall flooding, and lengthen the lifetime of the highway.

READ  Shopping for dad and mom' enterprise

LEAVE A REPLY

Please enter your comment!
Please enter your name here